Every construction project that affects a BC roadway needs a proper Traffic Management Plan (TMP). A weak plan delays approvals, slows your start date, and exposes your team to safety and compliance risk. Here are the five elements we never skip when drafting a TMP for clients.
Walk the site, photograph the conditions, and note traffic patterns at peak hours. Office-only TMPs always miss something the field reveals.
Diagrams must show signage placement, taper lengths, and pedestrian routing.
Every sign should be referenced by its standard plate number.
Define how emergency vehicles enter and exit the closure area.
Someone with authority to make decisions, on the phone, 24/7 if the project demands it.
Reviewers approve plans that demonstrate the author has actually walked the site.
Need a TMP for an upcoming project? Get in touch.
Let's talk about your traffic safety needs — call us or send a quick message.
Contact Us WhatsApp
Site Services
The three cleaning phases that take a building from dusty job site to handover-ready — and when to book each one.
Read More
Construction Labour
Ten minutes over the drawings before the first lift saves hours later. Here's what a good pre-shift huddle covers.
Read More
Safety Signs
A short guide to picking the right signs, the right materials, and avoiding under-spec products.
Read More